We had planned on fixing a couple of things before moving in to make the house more comfortable, but when we started digging, the projects became a bit larger than we intended.
Here, again, is the kitchen we purchased:
The sink and cabinets just weren't going to work for us, so we planned to tear everything out and set up a makeshift sink and cabinet area to use until the new kitchen is built. We knew the drainpipe outside needed to be fixed, but when we pulled out the sink, we found a rotten floor, joists, and sill too. We tore out the floor, and Curtis and Dad replaced the rotten framing and jacked it all up to make the floor *mostly* level.
We put down plywood to replace the floor, fixed the plumbing, and built a new sink cabinet. It's not the prettiest, but it will work just fine for the winter. Here is what it looked like before we moved in:
So now that we had a clean sink area and running water, we turned our attention to the bathroom. Here is what we found when we pulled out the old shower stall:
Yikes! The cracked shower had apparently been draining through the floor and the water had also found a path around the base of the stall out through the exterior wall. Add in a good dose of scary looking mold, and we had a pretty shabby looking bathroom.
We tore out the flooring, sheetrock, and plaster/laths. We then had to cut out the rotten portions of the studs and replace the studs, joists, and sills. Here is what it looked like from the outside:
Once all the major repairs were addressed, we then had to replace the floor, walls, and shower/plumbing! We pulled out the washer & dryer, and demolished the closet that had been in the bathroom corner. We then slid in a brand new tub/shower surround (that will get moved to the new bathroom this winter) and framed up a wall for the plumbing. The last plumbing connections were finally made on moving day! Here's the temporary bathroom, in all of its rustic glory: