Yes, we're still here and we're still plugging away at the second floor. Since our last post (sorry, our internet is so slow I can't stand to upload pictures), we framed up the exterior and interior walls:
Guest room
Master Bedroom
Master Bedroom
We did a side project before framing up the sitting area, and replaced a rotten window sill. We expected it to take a full day of frustrating adjustments to fit into the roof angle. Here is the original:
Next came another round of insulation for the newly framed exterior walls and roof slope. Let's just say the insulation doesn't like to stay up on such a steep slope with 3' spans between rafters. So I had to improvise with some window screening:
So puffy!
And here is the gaping hole we had for nearly one month:
And the ladder which served as our only means of access (below). We had to frame up a wall beside the chimney to replace the old boards and had to reinforce the other walls with plywood since the stairs had been the only thing holding them up beforehand. By the way, that ladder didn't actually reach all the way up, as you can probably see. The next maneuver including pulling myself up on the splintery studs and squeezing between them into the closet. Awesome.
We ran the last bit of wiring for stairway lighting and put up sheetrock, and finally started in on these twisty stairs. Curtis made pretty quick work of the winders in one afternoon:
We had to build custom stringers since this is such a steep staircase:
And we added in a third to make the stairs much more stable than they were to begin with:
After all that, Curtis was able to put together the rest of the stairs in a jiffy. We'll wait to put the finished treads and risers on after all of the construction is complete.
After the stairs, we had one final round of insulation to go up on the roof slope:
We made the last long wiring runs and put up vapor barrier. Strapping is mostly up on the ceilings and we have one last bit of plumbing to do before sheetrock goes up.
The sheetrock arrived yesterday!
And thanks to Curtis's brothers and our neighbors, all ~70 sheets are upstairs ready to be hung. Let the fun begin!
We've been making progress on the house, but distracting ourselves with other projects too:
The barn foundation is finally cleaned up!
Slowly teaching Sparrow to stay in the boat
New quilt to go on our bed in the new bedroom
Orland River Day. We didn't sink and we came in first!
Skiddin' logs to mill up for the pole barn
and we planted a garden this spring! strawberries, raspberries, blueberries, rhubarb, and asparagus are all planted and filling in nicely.
And finally, here's the critter update you've all been waiting for:
Sparrow works hard at supervising the progress upstairs, and covers herself in sawdust in the process.
Weaz is totally relaxed about turning 4 years old last week
Mr. Mouse celebrated his birthday watching the red squirrels ever so closely.
That's it! Sheetrock will go up next, and one of these days we'll tackle the siding too. Stay tuned.













