Sunday, June 16, 2019

Spring progress

Despite the lack of updates, we did manage to finish the upstairs earlier this spring.  After our last update, I finished the sheetrock in the kitchen and stairways, and repainted the kitchen (and most of the rest of the downstairs).  Curtis started in on the new stair treads on both sets of stairs: 


We also boxed in the kitchen cabinets with crown and touched up the paint on the cabinets too.  

I repaired the brick in the chimney and hearth, and we finally brought in the cookstove. 

After lots of touch-up and repainting, I painted both sets of stairs and we installed the railing, which is re-purposed from the original railing.



And here's the upstairs mostly furnished: 








Once the weather finally warmed up, we turned out attention to the outside of the house.  Here's what we've been living with for a couple of years:


The front came down first: 

Then the gable ends: 

And then I scraped the old trim:

And Curtis set to work on replacing a few sections of the sill:




The old trim is now primed, and there is a coat of paint on the old storm door.  


Meanwhile, we have been priming and painting up a storm.  Thanks to Mom and Dad, all of the siding is now primed! 

And I've set to work on putting the first coat of color on the siding.  
The second and final coat will go on once it's up. 

Next up, soffits and filling in the missing trim.  Then siding will be ready to go up!

Critter update.  
Mr Mouse has been camera shy lately, but here are the girls:
















Sunday, March 10, 2019

Sitting Room and Stairs


We've been picking away at the final projects upstairs.  First, we trimmed out the last window: 


 and in order to install the last light in the guest room, we had to remove it from the dining room.  So, ta-dum!  We finally installed the chandelier that has been sitting in a box for over a year.


This was all just to postpone the daunting task of busting a hole through the kitchen wall and trashing what was otherwise a perfectly "finished" room.  Here's what it has looked like:


and thanks to our forward thinking framing, I just had to cut out the sheet rock to expose the door frame.  Here's Curtis standing on planks in the basement stairway:


 We had already cleaned up the stairway and hung sheet rock the weekend before, so Curtis was able to dive right in and start building the stairs.  Here's the first three in the kitchen:

And then the tricky winders: 

 and the rest of them all the way up!

 Before I could finish up the sheet rock, we had to build the bookcase at the top of the stairs.  
Here it is in progress:


I begrudgingly patched in the rest of the sheet rock and am almost done with mud/tape: 


Unfortunately, I also seized the opportunity to fix other final details in the kitchen, which meant I made a giant mess.  Sheetrock dust is now everywhere despite vacuuming and washing the floors twice this weekend.  I still have one more sanding to go, so there's no point trying to clean again until that's done.

Here's how the stairway looks now--ready for it's final sanding then paint! 

And the bookcase is all trimmed out and ready for paint too!

And here's the handy critter update:

Sparrow is still loving winter and flops in the snow at every opportunity

Weaz has spent a fair amount of time curled up in the quilt while I work on it

Mouse rotates between cozy spots upstairs, in the loft, and then couch time with us at night.

And speaking of that quilt, after 3 months of hand-quilting, it's finally done!  I still need to make matching pillowcases, but that's for later.