Sunday, October 23, 2016

Ell reconstruction

The ell came down (apart from the roof), and we're now racing the weather to get the structure rebuilt and sealed in before snow or colder weather.  Since demo day, we had a trench dug out for a frost wall:


We had planned to do a concrete block foundation ourselves, but we ended up hiring out a poured foundation to keep our schedule on track.  Here are the forms all set after the footing was poured:


And here's our fancy new frost wall after the forms were stripped:

Then we had the task of putting in a foundation drain, installing insulation, and backfilling the new foundation.  Despite the short days, we managed to get in done evenings this week.



I spent Friday hauling rocks and smoothing out the inside to make an accessible crawl-space:

On Saturday, we installed the sills and corner braces for the roof.  It was a bit more of a project than we expected since the roof had pulled off to the side when we jacked it up.  



Rather than make the house any more crooked than it already is, we decided to haul on it until we could get it back to square.  Curtis used the borrowed tractor to lift the roof, then used the truck to pull on the corner of the gable until it squared up with the foundation and posts.  Slightly stressful, but worth the effort.

 After everything was squared up, we put up the other corners, braced it, laid down plastic, and called it a day.

The photos don't capture all of the glory, but today we put in the floor stringers, insulated the floor, and laid down the subfloor:

Next weekend, we'll frame up the walls and put up the sheathing.  If weather and time allow, we'll get in the windows and doors too!

Monday, October 3, 2016

In with the new, out with the old


With new fancy walls all primed and ready to go, it was time to put this kitchen together.  We popped in the new window (after finding the original broken a month ago). 



I then turned my attention to the floor and spent a whole day sanding and cleaning out decades of debris from the cracks:


Then it was time to finish the floor.  Here is the first coat, which was sucked up quickly by the dry, old wood: 


2nd coat:

 And final:

After a week of curing (and keeping critter toes out of the room), we were ready to move in the cabinets:

The countertop that came with the cabinets turned out to be too short, and not so great with the rest of the room.  We discovered this mid-afternoon on a Saturday, and ended up running to town to buy a butcher-block countertop instead.  Here it is in place for a test fit:


We laid out the sink the next day, and Curtis bravely cut a giant hole in the new countertop:


We'll turn that piece into a nice, giant cutting board so it won't go to waste.  I took over sanding and we popped the countertop into place, followed by the sink:



After a bit of research, we decided to stick with a simple mineral oil finish, which darkened the wood:


And just one day later, the appliances arrived!


Here is the whole room at this point (missing our table).  It will stay like this until the ell and stairs are finished, then I'll come back and piece in the last sheetrock before painting and tiling:


So now that the new kitchen is functional, it was time to take out the old and make way for a mud room/studio!  If you remember, this was the ell when we bought the house a year ago:


Here is how it has looked for the past year, as our kitchen/dining room/mud room/exercise room:



We emptied it out last week and tore into it this past weekend:


We had a siding crew tearing off the outside, while another crew tore out the plaster and laths



The chimney came down next, with far too little effort


The ceiling was next




Then came the half of the floor, so we could put up scaffolding to brace the roof structure


The sheathing went next:

Then the studs, until all we had left was the roof and half of a floor: 

Day 2 started with tearing out the interior wall, leaving a large hole directly into the stairwell and upstairs.  I had already blocked the living room door and kitchen entrance, so the critters were at least contained during the chaos.


Next came 3 layers of flooring, plus the original sub-floor.  We found brightly painting tongue and groove hardwood flooring with green stencils:


After the flooring came the joists:



And then the sills:



We sealed up the wall and tarped it (so classy), and will excavate for the foundation this week.  Then we'll put in the foundation, and throw up some walls to close this thing in before cold weather! 

Finally, here is the critter update:

Sparrow is officially 1 year old as of 9/17.  She celebrated with her new flying squirrel and chased her best doggie pal in the field.

Weez has had fewer outdoor adventures now that the ell is gone.  She hasn't learned to cry at the back door yet, so it's just a matter of time.

Mr. Mouse splits his time between the chimney and bathroom closet.  Or curled up next to us now that the house is a bit chillier.