The weather cooperated this weekend, and we made huge progress with the foundation. Here's what things looked like at the start:
The bad rainstorm we had in September didn't help the situation, and the bulging foundation seemed to be even worse. Before we had the septic system installed, we managed to pull out the granite capstone:
Here's what it looked like when we pulled the block away. Outside:
And inside:
When the septic system was installed, we had the excavator clean out the area for us to access the wall. Here's what the chaos looked like at that point:
We washed off the rocks to reveal the full disaster scene, and Curtis and I pulled out the top layer until the bulge finally came crashing down inside. I had the honor of pulling the rock that caused the crash!
We removed the rest of the rock and cleaned things up to get a good starting point to rebuild a straight wall. Dale started rebuilding the wall (with mortar this time!) and had a new wall up in a jiffy.
Here's how things looked at the end of the day Saturday:
This morning, we started mixing concrete to build up a stepped wall behind the rock wall. This is the first tier all poured, with the bracing for the next tier:
Mixing the concrete was a good opportunity to stand in the sun for a few minutes, and get some work done!
Two tiers poured, and one more ready to go!
Here's Dale finishing up the last bit of concrete for the day!
And here is our beautiful work for the day--done by lunchtime! We left it to dry for the rest of the day, and Curtis and I will backfill during the week so we can replace the granite capstone next weekend. Then it will be done!
Here's a happy work crew at the end of a busy weekend:
And most importantly, here is a happy Curtis, finally having a tractor on site just in time for his birthday tomorrow!