We've been hard at work over the past month, tackling giant projects before snow and even colder weather arrive. After the last update, we dropped all three liners into the chimney and installed the cap and covers just in time before the storms came:
We haven't finished the kitchen yet, but we did bust into the exposed chimney in the kitchen to put in the thimble for the cookstove. Outdoor projects took priority, so we'll put this on the winter project list.
It's a good thing we finished the chimney when we did, since the windy/rain storm came through with 60mph winds and knocked out our power for 5 days. We can manage just fine without power for that amount of time, but the worst part was that trees fell on our power lines and blocked our road for the same amount of time. 1/2 a mile from our house! Thankfully, I had already left before the trees came out so my car was outside and available but walking 1/2 mile back and forth to my car every day made life a bit more interesting.
We had left the ell roof covered with ice and water shield last Thanksgiving, so we figured it was about time that we put on a real roof before winter arrives. But first, we had to put up the soffit and the gable end to support the roof edge. We made a mini-version of the main house, and will add gutters in the spring that will wrap around to look just like the original eave returns.
After doing all the trim work, we put up the drip edge and finished the front side shingles in one day (with help from Dad):
Then we moved to the north side, and did it all over again. This time, we got mom up on the scaffolding and had an extra hand to pass up shingles:
Next, we took a big chance on the weather and dove into the main roof. Since we did the chimney, we trashed some of the shingles and had a big gap around the chimney where the flashing wasn't attached. I wanted it sealed up somehow before winter, so we at least wanted to strip the existing shingles and get new sheathing up and covered before snow.
Before we could put up the sheathing, we had to tear down the original gutters. They were solid pieces of wood and were mostly in good condition on the front. We'll rebuild something similar looking, but more functional in the spring.
It took us a day to strip each side, and another day to lay the sheathing and put up the ice and water shield. We ended up finishing up each side in the dark, which I would not recommend.
We stripped the north side, then had a helpful work crew come out for Curtis's birthday weekend.
Did I mention it has been really cold, and the north side of the house doesn't see any sun this time of year?
And this is how dark it was when we finally finished the ice and water shield. A rainstorm was coming in that night, and we finished just in time!
We had two cold days shingling the north side, and put up the last shingle around 8:30 at night before another rain storm:
And finally, we moved back to the warm, south side of the house and cruised through putting up the rest of the shingles:
We're all sealed up for winter and ready to take a break for the holidays!
Here's a glamour shot of Sparrow with the boys from Curtis's birthday weekend:
And cozy kitties that don't stray too far from the woodstove these days: