Wednesday, December 26, 2018

Upstairs progress

You guys.  It's been 5 months, and we've been working like crazy on the upstairs.  The problem is, I forget to take photos and update the blog in between projects, and then I say to myself. . . oh, I'll update that once [insert project] is done.  Then here we are 5 months later.  So here's a long recap of what we've been up to since July.  We left off with the framing, wiring, and insulation in place and the sheetrock had just been delivered.  First up, we had to install the shower pan in the bathroom, which was a test of faith that I wouldn't destroy it or cover it in paint, mud, grout, or some other substance to ruin it in the months to come.  


We then started hanging sheetrock, starting in the master bedroom:




And in the guest room:


Bathroom: 

And everywhere else: 

Unfortunately, after the sheetrock goes up someone needs to mud and tape.  This was my daily chore for 2 or 3 weeks. 

Here's the master bedroom again: 



Bathroom: 


Guest Room: 

Hallway: 

Once the sheetrock was up, we started framing up the wall/shelves to hide the stink pipe in the bathroom: 

And we tackled the tongue & groove pine ceiling in the sitting area with help from mom & dad: 



At some point, we put in the bathroom shower window:

And Curtis patched the floors where the walls used to sit: 

Next, I primed all of the walls (except for the bathroom):

Then came the sanding!  I rented an orbital sander and an edger, and then followed it all up with a 6" hand sander and a 5" sander.  Old floor boards don't lend themselves to quick and easy sanding.





After the sanding, we installed the rest of the windows and then came 3 coats of oil based poly:










We let things cure for a full week, and distracted ourselves with other projects.  We had picked up all of our siding back in August, and mom, dad & I spent several days priming.  We also striped the siding off the back of the house and attempted to blow in insulation.  It was a lot of effort for very little result, so I don't think we'll bother to do the other sides.  We put up the house wrap and called it good until spring. 


Next up, it was time to tile the shower.  Dad came over to help and took up his normal cutting duties:

It took about 3 days, and only a few melt-downs to get all of the tile up on the walls, ceiling, and slope:


After the tile mess was cleaned up, Curtis finished the built-in in the bathroom:

And we made the best of one of the last warm days to drag the tub outside to paint the base.  It stayed in the studio for a few more weeks until it made its journey upstairs. 

Curtis also built closets and shelves for the master bedroom.  We bought a dresser and built everything else around it: 


Here's the tub making it's way upstairs, through the former back staircase which has been our elevator shaft for a couple years:


I painted all of the walls, stained and finished the windows, and then painted trim in the master bedroom just in time to move upstairs before Thanksgiving.  For those of you that don't know, we offered to host Thanksgiving despite the fact that our bedroom was located in what would become the dining room, and the table we planned to use needed to be refinished.  Here's the bedroom ready for furniture:



The guest room trim was installed just before thanksgiving, but the final paint had to wait. 

 The table needed a few repairs before refinishing, and we brought it home the Friday before Thanksgiving.  I sanded it down in the garage:


And we quickly moved our bedroom upstairs (and hooked up the toilet) so that I could refinish the table in a heated space: 

We hosted both of our families for Thanksgiving, and took a brief pause from the next steps in painting and bathroom installs.  We have since installed the glass shower walls and fixtures, bathroom sink, clawfoot tub, and have painted the trim in the guest room and set up the bed frame.  We're giving ourselves a break before we dive back in to finish the last few tasks of installing lights and trim and busting through the kitchen wall to rebuild the back stairs.  Here's what things looks like today, all decorated for Christmas.

Dining room:


Living room: 


Guest room: 



Sitting room:

Master bedroom: 



Front stairway:

 Bathroom:



Our weekends and weeknights were pretty busy with these projects, but I promise we did manage to fit in some fun this summer!  Here's our trip to the balloon festival in Presque Isle: 

And just one of the beautiful views from the hikes on our road trip to Gaspe Bay:

I spent a lot of time in our field with our neighbor, Jen, keeping track of a healthy Monarch population.  And I finally caught one hatching from its chrysalis!


Missy and I took a natural dye class down at the Shaker village in New Gloucester: 

We weeded and watered all of the berries we planted this spring, and had a nice little pumpkin patch thanks to mom's seedlings!

Dad and I painted the camp and gave it a fresh new look.

And finally, a few weekends ago we did our annual birthday party/christmas tree hunt.  Curtis and Dad cleared the way:

And we managed to get a good group picture after a few tries: 


There are a few extra Sparrow photos this time, since she was so helpful with this phase of renovations.  She held the saw in place,

made sure this one didn't move either,

held up the window foam scraps,

sampled some sheet rock dust piles,

and sat a little too close while I was sanding.

Weaz has been enjoying the upstairs, and has claimed both the new couch and Sparrow's crate.

And Mr. Mouse spends his time chasing real mice, and then sleeping off the excitement in one of his many cozy spots.


Holy cow.  I think that's it for now.  Stay tuned for the last round of indoor projects, hopefully soon :)