We've been picking away at some of the last major projects in the ell, and are looking forward to moving on to another part of the house soon! We finished up the ceiling in the loft:
And made quick work of putting in the studio hardwood floor:
Next up was framing up the closet and installing the mudroom floor. Here's the closet all framed up:
And the floor:
Laundry and cabinets hooked up for the last time!
Then came trim. I did one door a night to make it bearable and even made a custom threshold for the pocket door. That's one of the sheathing boards we saved from the ell demo!
We re-purposed one of the original studs from the bathroom demo for our coat racks:
And finished trimming the windows today!
Next up: baseboard trim, loft floor, light fixtures, and closet trim.