With new fancy walls all primed and ready to go, it was time to put this kitchen together. We popped in the new window (after finding the original broken a month ago).
I then turned my attention to the floor and spent a whole day sanding and cleaning out decades of debris from the cracks:
Then it was time to finish the floor. Here is the first coat, which was sucked up quickly by the dry, old wood:
2nd coat:
And final:
After a week of curing (and keeping critter toes out of the room), we were ready to move in the cabinets:
The countertop that came with the cabinets turned out to be too short, and not so great with the rest of the room. We discovered this mid-afternoon on a Saturday, and ended up running to town to buy a butcher-block countertop instead. Here it is in place for a test fit:
We laid out the sink the next day, and Curtis bravely cut a giant hole in the new countertop:
We'll turn that piece into a nice, giant cutting board so it won't go to waste. I took over sanding and we popped the countertop into place, followed by the sink:
After a bit of research, we decided to stick with a simple mineral oil finish, which darkened the wood:
And just one day later, the appliances arrived!
Here is the whole room at this point (missing our table). It will stay like this until the ell and stairs are finished, then I'll come back and piece in the last sheetrock before painting and tiling:
So now that the new kitchen is functional, it was time to take out the old and make way for a mud room/studio! If you remember, this was the ell when we bought the house a year ago:
Here is how it has looked for the past year, as our kitchen/dining room/mud room/exercise room:
We emptied it out last week and tore into it this past weekend:
We had a siding crew tearing off the outside, while another crew tore out the plaster and laths
The chimney came down next, with far too little effort
The ceiling was next
Then came the half of the floor, so we could put up scaffolding to brace the roof structure
The sheathing went next:
Then the studs, until all we had left was the roof and half of a floor:
Day 2 started with tearing out the interior wall, leaving a large hole directly into the stairwell and upstairs. I had already blocked the living room door and kitchen entrance, so the critters were at least contained during the chaos.
Next came 3 layers of flooring, plus the original sub-floor. We found brightly painting tongue and groove hardwood flooring with green stencils:
After the flooring came the joists:
And then the sills:
We sealed up the wall and tarped it (so classy), and will excavate for the foundation this week. Then we'll put in the foundation, and throw up some walls to close this thing in before cold weather!
Finally, here is the critter update:
Sparrow is officially 1 year old as of 9/17. She celebrated with her new flying squirrel and chased her best doggie pal in the field.
Weez has had fewer outdoor adventures now that the ell is gone. She hasn't learned to cry at the back door yet, so it's just a matter of time.
Mr. Mouse splits his time between the chimney and bathroom closet. Or curled up next to us now that the house is a bit chillier.